Wind and dust suppression network has the characteristics of high temperature
resistance, acid and alkali resistance, aging resistance, high strength, long
service life and so on. The construction is divided into three steps:
1. Underground foundation: Precast concrete block or on site pouring underground foundation.
2. The supporting structure: "wind dust network" for supporting the use of steel bracket, bracket structure without special requirements, the main consideration to "wind dust network" to provide sufficient strength against the winds of destruction, followed by consideration of the overall appearance. The design parameters can be calculated by the wind speed 30m/s and the wind pressure 750Pa.
3. Windshield installation: wind and dust suppression board theory: life 15~20 years. Ambient temperature: -40 degrees C 80. The connection way of the bracket is fixed by screws and plates. After the engineering application in recent years, the comprehensive dust suppression effect is obvious. The dust suppression effect of the single layer wind and dust suppression net can reach about 65%~75%, and the dust suppression effect of the double layer wind and dust suppression net can reach about 75%~85%. Therefore, the establishment of wind and dust suppression network can effectively protect the environment. At the same time neat and beautiful wind and dust suppression network to build a scenic line in these areas.